
From concept to completion, we provide comprehensive engineering services tailored to your project's unique demands.
Comprehensive project planning with detailed feasibility studies, resource allocation, and timeline optimization to ensure successful project delivery from conception to completion.


Expert project management services with dedicated teams, milestone tracking, and quality assurance throughout the project lifecycle ensuring on-time delivery.

We provide complete on-site services and engineering services
Professional installation and commissioning services with expert teams ensuring safe and efficient project execution according to industry standards.
From initial design concepts to long-term operational support, we provide end-to-end engineering services that ensure project success and sustainable operations.
Comprehensive design and engineering solutions from concept to execution
Development of preliminary plant layout options, including general arrangements and placement of major machinery for optimal workflow and space utilization
Basic design engineering, covering general arrangements, selection of machinery, steel plant equipment, material handling systems, and waste material management solutions
Preparation and compilation of detailed engineering and execution drawings for civil, structural, electrical, and automation systems to facilitate smooth field implementation
Detailed project planning and documentation services
Preparation of detailed Requests for Quotation (RFQs) and Bills of Quantities (BOQs) to support accurate budgeting and procurement processes
Drafting of technical specifications and comprehensive tender documents for the procurement of production equipment, auxiliary systems, and civil & structural construction works
Development of a detailed project bar chart outlining timelines, milestones, and critical activities for effective project scheduling and monitoring
End-to-end procurement management and vendor coordination
Collection of techno-commercial proposals from vendors and preparation of detailed comparison charts to support informed decision-making
Assistance in the procurement process for equipment and materials, ensuring cost-effectiveness and quality compliance
Regular coordination and follow-up with vendors and suppliers to ensure timely delivery of equipment and materials as per project schedules
Provision of third-party inspection services to verify quality, compliance, and performance standards of procured items
Complete project execution with quality assurance and compliance
Design and planning of essential utilities and services, including water supply, compressed air, fuel oil systems, industrial gases, maintenance workshops, testing laboratories, pollution control systems, ventilation and air-conditioning, fire protection systems, internal roads, and drainage infrastructure
Construction support services, encompassing site supervision along with quality control and quality assurance to ensure compliance with engineering standards and project specifications
Comprehensive support for inspection, erection, and commissioning of equipment, ensuring smooth installation and operational readiness
Expert fabrication and installation services with industry-best practices
Execution of on-site activities, including pipeline fabrication, cable laying, and installation of machinery with precision and adherence to safety standards
Planning, monitoring, and execution of high-quality erection works under the expert guidance of former Electrotherm professionals, ensuring industry-best practices and reliability
Long-term operational support and maintenance management
After successful commissioning, we deploy a dedicated on-site Engineering and Management team, backed by continuous support from our core experts, to ensure achievement of desired outcomes and long-term sustainability
Join industry leaders who have already enhanced their efficiency with our advanced Engineering solution. Get expert consultation and a customized quote for your specific needs.
Customer Satisfaction
Technical Support
Years Experience
Global Installations
Get expert advice tailored to your specific needs
Tailored to your exact requirements
Get a quote within 24 hours
Trusted Partner of Leading Iron & Steel Industries Worldwide